Toilet

HomeToilet

Toilet

Container washroom units arrive ready to connect, with fresh-water and waste tanks built in — suited to construction sites, camps and public events.

Why HUIYANG Toilet

A quick-assemble toilet is a factory-built wet room that ships flat and bolts together on site: four colour-steel EPS wall panels onto a galvanised steel frame of 76 x 76 mm powder-coated columns and 1.0 mm rails.

  • Quick-assemble single, double and integrated bathrooms
  • Knock-down: up to 65 single cubicles per 40HQ
  • Galvanised frame with colour-steel EPS panels
  • Pan, basin, light and pipework fitted before packing
65sets Single toilets per 40HQ, knock-down
180kg Single unit, net weight
0.21mm Colour-steel EPS panel skin
  • Toilet — photo 1
  • Toilet — photo 2
  • Toilet — photo 3
  • Toilet — photo 4
  • Toilet — photo 5

Product Overview

What is a Toilet?

A quick-assemble toilet is a factory-built wet room that ships flat and bolts together on site: four colour-steel EPS wall panels onto a galvanised steel frame of 76 x 76 mm powder-coated columns and 1.0 mm rails. The range starts at a single 1130 x 1230 mm cubicle and runs to a 3030 x 1230 mm integrated bathroom with a glass partition and shower, with double-cubicle units and standalone shower rooms in between. Pan, basin and tap, ceiling light, wiring and the water inlet and waste outlet are all fitted in the factory, so assembly is panels, sealant and two connections. Fully assembled units are available for projects that would rather not assemble anything on site.

HUIYANG

Explore Our Toilet Series

HUIYANG

Knock-Down Density, Factory Fittings

  • 65 Sets Per 40HQ

    A single toilet ships knock-down at 65 sets per 40HQ. Order the same unit assembled and 18 fit in the container instead.

  • Galvanised Frame

    76 x 76 mm powder-coated columns and 1.0 mm top and bottom rails, bolted together on site without welding.

  • Colour-Steel EPS

    0.21 mm colour-coated steel either side of a 12 kg/m3 flame-retardant EPS core, in panels 50 mm thick.

  • Drained Stone Floor

    Steel frame floor finished in artificial stone and drained to a single waste outlet at the back of the unit.

  • Fitted Before Packing

    Ceramic pan, basin with mixer tap, ceiling light, wiring and inlet/outlet pipework are installed in the factory, not on site.

  • Four Unit Families

    Single toilet, double toilet, integrated bathroom with shower, and shower room — each available with a sitting or squat pan.

Shipping Efficiency

65 Units Per 40HQ

Freight decides the landed cost of a sanitation order, and knock-down packing is why these units travel well. A single toilet is 1130 x 1230 mm, so 65 sets fit in one 40HQ when shipped flat; order them assembled and 18 fit. Double units pack 24 knock-down or 9 assembled, integrated bathrooms 21 or 7, and shower rooms as many as 70. A knock-down kit is four wall panels, a floor, a roof and a box of fittings — two people assemble one in about an hour with hand tools.

  • 65 sets knock-down / 40HQ
  • 18 sets assembled / 40HQ
  • 1130 x 1230 x 2310 mm per unit
65 Units Per 40HQ
65x per 40HQ container

Interior

Fitted Before It Leaves the Factory

The wet area arrives finished. Every unit carries a ceramic pan (sitting or squat), a basin with mixer tap, a ceiling light, a timber or artificial-stone floor drained to one outlet, and a steel door with a lever-handle lock. Water inlet and waste outlet are terminated in the same corner so a plumber makes two connections and is done. Options add a premium shower set, glass partition and sliding door, towel rack, tissue holder and coat hooks, and a European-standard lock on the integrated models.

  • Pan, basin and tap fitted
  • Ceiling light and wiring included
  • Steel door with lever-handle lock
Fitted Before It Leaves the Factory

Applications

Sanitation Where the Main Building Cannot Reach

A standalone bathroom unit works where running plumbing is not practical: a pool house, a workshop yard, a garden room, a park pavilion, or a site compound that packs up in a year. Because it is one rigid box it can be craned onto a pad now and moved again later, and it can be supplied with fresh-water and waste tanks so no drainage connection is needed at all. When the project ends the units are lifted onto a truck and reused on the next site rather than demolished.

Sanitation Where the Main Building Cannot Reach

HUIYANG

Download Resources & Media

  • Comprehensive Catalog

    Download our complete product catalog covering expandable house specifications, layouts, and configuration options.

    Download
  • All Model List

    Access a detailed list of all available expandable house models and structural variations.

    Download
  • Video Quick View

    Watch short videos showcasing product structure, expansion process, and real installation scenes.

    Watch Video

HUIYANG

Certified Quality & Compliance

HUIYANG follows internationally recognized manufacturing standards, with ISO 9001 certification and complete internal quality control processes. We use standardized production and professional team training to make sure every expandable container house is built stably and accurately. Our CE and other company certificates show we take safety, reliability, and international standards seriously.

  • RoHS
    RoHS EU 2011/65/EU
    and 2015/863
  • CE - CPR
    CE — CPR EN 1090 steelwork
    valid to 2031
  • RoHS Test Report
    RoHS Test Report 11-page lab report
    result: Pass
  • ISO 9001
    ISO 9001 GB/T19001-2016
    valid to 2028

HUIYANG

How to Order an expandable container house

HUIYANG provides a simple, efficient ordering process specially designed for compact expandable units and multi-unit projects.

  1. Step 1 — Inquiry & Requirement

    Tell us how the expandable container house will be used, how many units are needed, and where they will be delivered.

  2. Step 2 — Layout & Use Planning

    Select the preferred interior layout and functional setup based on living, working, or temporary accommodation requirements.

  3. Step 3 — Production Scheduling

    Once we confirm all the details, we start production in our factory using standard procedures. This makes sure every expandable unit is built with consistent quality.

  4. Step 4 — Packing & Container Loading

    Completed houses are folded, protected, and loaded efficiently, allowing up to four expandable units to fit into one 40FT container.

  5. Step 5 — Delivery & Setup Guidance

    We help arrange shipping and offer instructions to make sure each expandable expandable unit can be easily unfolded and set up on site.

HUIYANG

Expansion & Installation Guide

The expandable container house arrives folded. It is lifted by crane onto a prepared base, then unfolded and fixed into place. Final sealing, trims and utility hook-ups complete the on-site installation — typically within 2 to 3 hours with a small crew.

Crane lifting installation of an expandable container house

Crane Lifting Installation

Each unit ships with ISO corner blocks and lifting points marked at the factory, so a standard crane can set it down onto prepared foundations or footings in a single controlled lift. No site welding and no temporary scaffolding are needed for placement.

Send Inquiry Now
Simple expansion and installation process

Simple Expansion & Installation Process

The unit is delivered folded inside a 40HQ container and set down on a level base. Both sides are unfolded and locked with support legs, then sealing strips and trims go on, followed by the electrical and plumbing connections. The interior is finished at the factory, so nothing has to be built on site.

Send Inquiry Now
Start your expandable container house project

Start Your expandable House Project

Get detailed specifications, factory pricing, and shipping solutions for your expandable container house. We’ll reply quickly and give you advice based on your needs.

Typical Use

How Our Houses Are Used

What each type of buyer tends to ask for, grouped by how the unit is used.

  • Residential

    Most single-unit buyers are putting a house in a garden or on land beside an existing home, and they ask for the interior first — flooring, kitchen and bathroom in place — because they are moving in rather than building on. The 20FT suits this best: two bedrooms without taking over the plot.

    Private homeownersGarden plots and family land
  • Hospitality

    Rental operators usually buy several units at once, and care less about floor area than about turnaround: independent access, a private bathroom, and an interior that still looks new after a season of guests. The 30FT is the common pick here, since it takes a corridor layout with two or three rooms.

    Short-term rental operatorsMulti-unit sites
  • Distribution

    Distributors buy on repeatability: the same panel set, the same fittings and the same packing list on every order, so their install crews do not have to relearn the product. Packed volume matters as much as the unit itself, because freight is charged on the space taken inside the container.

    Prefab distributorsRepeat and project orders

What a Prefab Container House Is

A prefab container house is built on a galvanised steel frame and finished in a factory before it ships. Depending on the type it either travels flat-packed as panels, unfolds from container width on site, or stacks as two storeys — but in every case walls, insulation, wiring and fittings are complete before the container is opened.

The range runs from a single 16 m² module or a self-contained bathroom unit, up to a 72 m² expandable house with four bedrooms and three bathrooms. Footprints and room counts vary by model, and the sections above give the figures for this one.

Because there is no second fit-out stage on site, only sealing, trims and the utility connection remain after delivery. That is what keeps installation to hours rather than weeks, and what makes these units practical for remote sites and staged projects.

Frequently Asked Questions

A prefab container house is built on a galvanised steel frame and finished in a factory before it ships. It travels either flat-packed as panels or folded to container width, then becomes a finished room or house on site. Walls, insulation, wiring and fittings are all complete before the container is opened.

From a single self-contained bathroom unit up to a four-bedroom house with three bathrooms. Standard layouts pair bedrooms with a kitchen, a bathroom and a living area. The exact count depends on the footprint, and the sections above list what this model takes.

A detachable container module closes in about 3 hours with four workers — no welding, crane or forklift needed. An expandable unit unfolds and is fixed in place in 2 to 3 hours with a small crew and a crane or forklift. A two-storey house is two modules, so allow about 3 hours per level plus the lift of the upper module. Knock-down bathroom units take about an hour with two people.

Detachable container modules flat-pack 17 to a 40HQ or 7 to a 20GP — that is 8 complete two-storey houses per 40HQ. Expandable units ship 1 to 2 per 40HQ depending on size, and quick-assemble toilets ship 65 single cubicles knock-down or 18 fully assembled per 40HQ.

Residential living, staff and worker accommodation, site offices, rental cabins, guest houses, temporary housing and sanitation for camps and events. The same structure serves all of them; only the internal layout and fit-out change.

Partitions are set at the factory, so the layout is agreed before production rather than changed on site. Tell us the bedroom and bathroom count you need and we will confirm which footprint takes it. Within the same frame, finishes, bench positions and window placement can be adjusted.

ISO 9001 for quality management (GB/T19001-2016), CE marking under the Construction Products Regulation with EN 1090 steelwork verification, and RoHS compliance for restricted substances. Certificates and test reports are available on request.

Every order includes a written installation manual and a video covering the assembly or fold-out sequence, sealing and utility connections. Our technical team stays reachable by email or phone during installation, and spare parts - sealing strips, window and door hardware, electrical fittings - remain available after delivery.